13 December 2010 By admin Posted In NJ Meditation Center WithNo Comments on ဓမၼာ႐ုံ ေယာဂီေဆာင္ ေဆာက္လုပ္ေရး (၁၃-ဒီဇင္ဘာ-၂၀၁၀) ဓမၼာ႐ုံ ေယာဂီေဆာင္ ေဆာက္လုပ္ေရး (၁၃-ဒီဇင္ဘာ-၂၀၁၀) Installing reinforcement rods for Building One basement concrete wall and spreading gravels/rocks at the base of Building Two for laying of foundation on 13-December-2010.